Colocation rack density has shifted dramatically — from 5kW per rack in the virtualization era to 50kW and beyond for AI and HPC workloads. Legacy air-cooled halls weren’t built for this. Here’s what that means for operators sitting on aging infrastructure, and how Infrastructure Density Uplift changes the math.
