Colocation rack density has shifted dramatically — from 5kW per rack in the virtualization era to 50kW and beyond for AI and HPC workloads. Legacy air-cooled halls weren’t built for this. Here’s what that means for operators sitting on aging infrastructure, and how Infrastructure Density Uplift changes the math.
When to Replace Aging CRAC Units: A Guide for Colocation Operators
Legacy CRAC units are holding colocation operators back — on refrigerants, energy costs, density, and tenant demand. Here’s how to know when it’s time to act.
What Is Infrastructure Density Uplift (IDU)? Maximizing Data Center Capacity Without New Construction
Data center operators face an uncomfortable reality AI and high-performance computing workloads are driving rack density requirements from 10-15 kW to 50-100 kW or higher, yet building new facilities takes years and costs hundreds of millions of dollars....
Reach Out
Start Cooling Smarter
Whether you need to upgrade your existing setup or design something new from scratch, we have the know-how and technology to help you get more computing power while spending less on cooling.